

Shovel-ready powered land
Bypass multi-year grid bottlenecks. Secure pre-zoned parcels from 20MW to 200MW with immediate substation access and high-density fiber pathways.






Engineered for heavy compute
A visual record of our active development sites, high-voltage substations, and dedicated fiber conduit pathways across the United States.
Verified capacity, zero wait
We bypass traditional utility queues by delivering sites with active substation infrastructure and dedicated fiber routes already in place.
TX-1: West Texas
OH-2: Columbus Corridor
CO-1: Denver Metro
150 MW
Substation Capacity
80 MW
Immediate Power
45 MW
Stranded Gas Power
Pre-zoned site converted from a high-voltage industrial facility. Dual-route dark fiber adjacent.
Active substation on-site. Direct connection to major transcontinental fiber routes. Ready for immediate pad construction.
Off-grid power generation utilizing local stranded natural gas. Ideal for high-density inference workloads.
Secure your compute footprint
Don't let grid queues freeze your deployment. Contact our acquisition team today to receive detailed technical briefs, fiber maps, and power delivery timelines for our active sites.
Landcor
Shovel-ready megawatts. Inference-first site design.
Sitemap
Home
Available Sites
Solutions
Contact
Acquisition
acquisition@landcor.com
© 2026 Landcor-Delivering near-term power infrastructure across the U.S.
POWERED LAND FOR AI INFERENCE
